Type in the fields or print a blank copy using your browser’s Print command. You can select and copy the record text into your own document. This page has no submission function; the site does not save field entries. Copy or print your work before leaving.

Use the related guides for the explanation behind each check. This blank record does not certify material, replace the contract or establish a claim deadline.

Inspector measuring a chipped granite piece beside an opened shipping crate
Inspector measuring a chipped granite piece beside an opened shipping crate

Link the delivery receipt to the damage log

Use the same crate and piece IDs on the packing list, photos and damage log. Record how many pieces arrived, where you saw the damage and which photos show the label, the full piece and the affected area. If a piece could not be checked safely, record it as inaccessible.

Example entry: Crate C-A, piece A: chip at the lower outside corner; photos CA-label, CA-full and CA-corner. Delivery receipt DR-A notes the exception; piece held for review; carrier notification recorded in the notice field.

Missing photos can make the condition harder to demonstrate. Keep the delivery receipt, packing list, carrier notices and other contemporaneous records together. Use the applicable contract, carrier and insurance terms to determine notice deadlines and required evidence.

Granite China · Granite Receiving Inspection Record

1. Delivery identity

Order / supplier / stone name
Delivery date / time / receiver
Carrier / consignment / seal reference
Crates expected / received
Delivery receipt reference / signing exceptions

2. Photos and checks

Crate and label photo filenames / references
Piece counts expected / received / inaccessible
Edges and corners: condition / pieces affected
Colour range against approved samples / reference ID

3. Damage log

Use piece and crate IDs; attach a numbered continuation sheet if needed.

Crate / piece IDLocation and conditionPhoto referenceAction / hold status
Claim notice deadline / contract or carrier reference
Who was notified / when / how
Receiver signature / date

Check the actual notice deadline promptly. Keep damaged pieces and packing where safe; do not install disputed pieces while their condition is unresolved.